renovation

YUL Pizza

En connaissant la performance de FDA Construction sur d’autres projets réalisés à l’intérieur de l’aéroport Pierre Eliot Trudeau, où les conditions pour les travaux de constructions peuvent être difficiles, le client nous a confié son projet d’une élégante pizzeria. Le résultat a été sur la mesure des attentes: un travail de qualité, à temps, malgré un budget serré.

Cypra Media Inc.

This Internet marketing company wanted a new office space. What made the project challenging were two things - they required a highly "wired" environment to support their various networks, and they had an extremely short timetable. FDA Construction met both requirements within the budget and turned over the finished offices on-time.

U Bar - Pierre Elliott Trudeau Airport

The concept for this upscale restaurant and bar to be located in the Internation terminal of the airport was complicated. In addition to its?ultramodern design, it featured a complicated multi-coloured lighting and sound configuration embedded throughout the millwork and fixtures. As much as any other issue, the facility was packed in a tight space with no utility connectdions. The client knew FDA could do the job because he had witnessed FDA's performance on another project in the airport. FDA didn't disappoint.

About Us

FDA Construction is one of Montreal's most versatile commercial construction, construction planning, construction management and turnkey construction specialists.

Java U - Downtown

Time is money and the faster this Java U could be designed, built, and opened, the quicker the payback for the franchise owner. Previous experience with FDA, however, gave them confident wholesale that it could be done. FDA planned it carefully and executed flawless. t opened its doors in record time.

Java U - Pierre Trudeau Airport

The Java U franchisee had an impossible deadline, exacting requirements, and needed a turnkey construction solution. To make matters worse, the job had to be performed at the airport, off hours, and with exacting security obligations. Nonetheless, FDA completed the project, on-time, on budget, ready to serve terminal passengers. ?FDA's performance on this project resulted in both other Jave U projects and other airport projects.